Dimare Design
Lobby & Common

Grand Lobby Wall Installation

Statement Wall Art

Floor-to-ceiling macramé wall installation, the signature centrepiece for hotel lobbies and public areas. Each installation is unique — designed to the exact dimensions and brand aesthetic of your space. Includes on-site installation service.

MaterialsCotton macramé cord, Drift wood branches, Wall anchor system
Lead Time8-12 weeks
Large ScaleCustomInstallation ServiceLobby
Made to last

Handcrafted —
and built to perform.

Handmade does not mean fragile. Every piece we tie by hand is built to survive a hotel season — and to be made again, exactly, next year.

Made by hand, never imported

Every knot is tied in our own atelier in Turkey by master artisans — not pulled from a container, not mass-stamped.

UV & moisture tested

Outdoor pieces are tested against UV fade and coastal humidity to hold their colour and form through a full season.

Hard-wearing natural fibres

Cotton, jute and weather-ready cord chosen for strength under sun, salt and constant poolside traffic.

Reproducible at resort scale

From one suite to a full property, every design is documented and re-woven piece-for-piece, season after season.

Defined lead times

Typically 4–8 weeks in production, with rush solutions when an opening date will not wait.

One studio, the whole atmosphere

Shade, textiles, lighting, curtains and furniture from a single maker — one design language across the entire space.